Below is the average costs for Advanced/Direct straight-time, over-time and double-time Installation & Dismantle labor costs. This data was taken from 2 shows in Dallas.

 

DALLAS I&D LABOR

AVERAGES:

  DIRECT   ADVANCED
 
STRAIGHT TIME (ST)
  $92.95
  $71.50
 
OVERTIME (OT)
  $139.43
  $107.25
 
DOUBLE TIME (DT)
  $185.90
  $143.00
 



 
Below is the list of shows in Dallas used in the calculation of these cost averages.
The shows listed in green are Low-cost shows;

the shows listed in blue are Average-cost shows;

and the shows listed in red are High-cost shows.


The following rates, which are indicative of each show's cost level are for Direct Labor.



Show
Date GC   ST OT DT
WFX
Oct. 2014
Shepard   $89.70 $134.55 $179.40
CMSC
May 2014
Freeman
$96.20 $144.30 $192.40







 

 

This information on this page is provided to all E2MA members to assist in budgeting labor costs in Dallas.  The data provided is derived directly from show kits forwarded to us by E2MA members, and industry colleagues.  We welcome any and all contributions to this effort.  If you have a show kit to share send it to meredith@e2ma.org.